Building Safety Remediation Bill: A new duty to remediate

17 Nov 2026

The Government has finally published the Building Safety (Remediation of Unsafe Cladding) Bill (the “Bill”) which is designed to speed up the remediation of unsafe cladding and strengthen the enforcement mechanisms available where those responsible fail to act. Introduced in the House of Commons on 14 October 2026, the Bill is currently at Committee stage. While the Bill covers a wide range of issues this article is focussed on the new remediation obligations contained within it.

A new legal duty to remediate

Perhaps the most significant development is the introduction of a clear statutory duty to assess and remediate life-critical external wall fire safety risks.

The duty will apply to multi-occupied residential buildings in England over 11 metres in height or with at least five storeys, where the building was completed before 28 June 2022. It will apply to both private and social sector buildings, including enfranchised and commonhold buildings. Buildings already subject to the Developer Remediation Contract will, however, be excluded as equivalent obligations already apply.

But who actually has to comply with the duty?

The Bill introduces the concept of the “responsible entity,” being the party with the relevant repairing obligation for the building. The Bill seeks to provide clarity by imposing obligations directly on responsible entities to undertake the assessment and then remediate where required.  A duty to enforce this obligation will be placed upon local authorities, fire and rescue authorities and the Building Safety Regulator.

Standardisation of assessment

The Bill makes clear that the assessment of risks will have to follow PAS 9980 which currently has the standing of industry guidance.  By making the assessment methodology a legal requirement, the Bill provides both uniformity in the manner in which buildings are assessed and clarity to all as to the process of assessment.  The Bill envisages that assessments must be undertaken within 12 months of the Bill being introduced to law unless an assessment has been undertaken on or after 16 May 2022.  The date for commencement of the assessment window ensures that responsible entities who have recently undertaken a PAS9980 assessment are not required to start the assessment process afresh.

A plan for remediation

Where remediation work is required, the responsible entity will have to prepare a Remediation Compliance Plan within 15 months of the Bill becoming law. That plan must set out the timetable for completion of remediation works by no later than the backstop date (see below) and will need to include any interim measures to be put in place pending completion of the work.  Corporate responsible entities will need to identity a director responsible for compliance with the duties of the responsible entity alongside details of the corporate group structure of the responsible entity and beneficial ownership of the same.

The Remediation Compliance Plan must be published on the responsible entity’s website and proactively shared with residents and leaseholders.

Deadlines for work to be completed

The Bill provides that work to remediate must be undertaken as soon as reasonably practicable and that financial assistance may be available to assist compliance in the form of a grant or loan, although, this does not appear at present to be a positive commitment to provide financial assistance to responsible entities.

Penalties

The Bill makes provision for penalties to be imposed in the event of failures by the responsible entity to comply with its duties under the Bill.  These range from fines (which can in certain circumstances be assessed as a percentage of group company turnover) to in some cases prison.  The Bill certainly has teeth in its present form.

Fines and other sanctions do not however see the remediation work done in the absence of engagement by a responsible entity. The Bill therefore introduces Remediation Management Orders which are orders conferring powers upon local authorities and the Homes and Communities Authority (HCA/Homes England) to properly remediate external walls in the face of non-compliance with the duty to remediate under the Bill and to recover all costs related to the same.

The Bill does introduce a ‘reasonable excuse’ defence which is intended to avoid penalising responsible entities where genuine progress is being made but delays have arisen from matters outside their control.

A relevant buildings register

The Bill seeks to introduce a register of residential buildings in England falling within the 11-18m height range. Responsible entities will be required to provide relevant information, helping to establish the scale of the medium-rise building stock and identify buildings which may require assessment and remediation.  Details as to what information is to be provided and by when is not contained in the Bill and instead is intended to be introduced by separate secondary legislation.

Where does this leave the industry?

The Bill is significant because it moves the remediation regime further from one dependent upon individual enforcement action towards one underpinned by direct statutory obligations.

For freeholders and others with repairing obligations, the immediate task will be to establish whether buildings within their portfolios fall within the scope of the new regime, identify the responsible entity, and review the adequacy of existing fire risk and external wall assessments. Where remediation is already required, responsible entities will also need to consider whether their existing programmes and timescales are likely to satisfy the requirement to function as soon as reasonably practicable.

The implications extend further than building owners. Developers, contractors, and construction product manufacturers should continue to consider potential exposure as remediation progresses and those conducting or funding works look to recover their costs.

There is still further detail to come. The Bill remains subject to amendment as it progresses through Parliament, and several aspects of the regime will depend upon secondary legislation and statutory guidance. The Government anticipates that the relevant secondary legislation will be made within one year of Royal Assent, while the principal duties to assess, mitigate and remediate are intended to come into force two months after Royal Assent.

What is clear, however, is the direction in which the regime is heading. Those responsible for affected buildings will no longer simply face pressure to remediate. The Bill seeks to place that responsibility on a statutory footing, backed by significant enforcement powers and, ultimately, the ability for a public authority to step in where that responsible fail to act.

How we can help

If you would like to discuss the implications of the Building Safety Act, please contact a member of our construction and building safety team.

Nitej Davda

Partner
Property and construction disputes

Michael Davies

Trainee Solicitor

Share